Scythia Solar-1

Comissioning 2019

Location: Zaporizzhia
DC capacity: 13 MW
Land use: 20 ha
Reduction of CO2: 15600 tons
Jobs creation: 20 employees

Overview

Capacity DC/AC 13.0/10.0 MW EPC contractor KNESS
Production 1 610 kWh/m2 Start of operations December 2018
GHI 1 150 kWh/m2 PPA until 31.12.2029
Land 20 ha, 49-year lease